| 38 RFX400 TOP RAIL FOR LEVEL APPLICATIONS Straight Splice Option 1 Both top rails slide over top of post and attach with screws. 1 screw on each side. (Total of 4 each screws). Angle Splice Splice must be secured into place with 8 each screws from underside. (Top rail must be mitered). Straight Splice Option 2 Splice must be secured into place with 8 each screws from underside. Splice is made from a cut piece of Internal Post Stiffener. RFX400 – Flat Infill Cut flat infill to length and snap into bottom side of top rail. NOTE: Install prior to tensioning the cables. Straight Splice Option 3 Use wood / Composite as splice to connect rails together where RFX400 rails meet between posts.